Loading...
Help
Login
Busy
Search
eHDSI - Issues
 
Select object
 
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
236Relaxation of constraints for EntryAllergyAndIntolerance templateClosedNormalChange Request2018-11-19 10:00:16Christof Gessner
 
Change RequestRelaxation of constraints for EntryAllergyAndIntolerance template
Idepsos-issue-236
StatusClosed
PriorityNormal
Last Tracking2018-11-19 10:00:16  by  Mathias Ghys
Current AssigneeChristof Gessner
    
Concerns
Template
(1.3.6.1.4.1.19376.1.5.3.1.4.5)
/
/
Template1.3.6.1.4.1.19376.1.5.3.1.4.5 (2013-12-20) Artifact cannot be found!
/
-
/
-
Events
TrackingClosed2018-11-19 10:00:16: Tracking by Mathias Ghys
Description
Change implemented. This is a technical correction, so no need for approval. The Allergies And Intolerances template has to conform to the IHE PCC Problem template. For now this is an issue, since the IHE PCC Problem template and the Problem template use the same OID.

For the IHE PCC Problem template, the Id has cardinality 1 .. 1 and conformance M
For the Problem template, the Id has cardinality 1 .. 1 and conformance M

So it makes sence to also restrict the conformance of the Allergies And Intolerances template to 1 .. 1 M
Assignment2017-11-03 11:18:21: Assigned To Christof Gessner by Mathias Ghys
TrackingOpen2017-11-03 11:18:20: Tracking by Mathias Ghys
Description
Finding:

In the Template EntryAllergyAndIntolerance   [1.3.6.1.4.1.19376.1.5.3.1.4.6]   in ART-DECOR, the hl7:id element is not consistent with the inheritance from the template Problem [1.3.6.1.4.1.19376.1.5.3.1.4.5]

- The template EntryAllergyAndIntolerance   inherit from the template Problem, the template EntryAllergyAndIntolerance   says that hl7:id is 0..* , however the template Problem says that hl7:id is 1..1. This is not permitted to relax constraints.

Suggestion:

- Change the EntryAllergyAndIntolerance template and make the id a 1 ... 1 (with a conformance M?)

Further explanation:

-

    
Labels
PreviewCodeHTML colorDisplay NameDescription
 
 TBA 
TBATBATo be approved
To be discussed and approved
 
 M1 
M1M1Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2M2Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3M3Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4M4Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJWJChanges Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TIDTIDTemplate ID
Template-ID changes throughout the specification