Help
Login
Busy
Search
eHDSI - Issues

 
Select object
 
false
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
236 Relaxation of constraints for EntryAllergyAndIntolerance template Closed Normal Change Request 2018-11-19 10:00:16 Christof Gessner
 
Change Request Relaxation of constraints for EntryAllergyAndIntolerance template
Id epsos-issue-236
Status Closed
Priority Normal
Last Tracking 2018-11-19 10:00:16  by  Mathias Ghys
Current Assignee Christof Gessner
    
Concerns
Template
false
(1.3.6.1.4.1.19376.1.5.3.1.4.5)
/
/
Template 1.3.6.1.4.1.19376.1.5.3.1.4.5 (2013-12-20) Artifact cannot be found!
/
-
/
-
Events
Tracking Closed 2018-11-19 10:00:16 : Tracking by Mathias Ghys
Description
Change implemented. This is a technical correction, so no need for approval. The Allergies And Intolerances template has to conform to the IHE PCC Problem template. For now this is an issue, since the IHE PCC Problem template and the Problem template use the same OID.

For the IHE PCC Problem template, the Id has cardinality 1 .. 1 and conformance M
For the Problem template, the Id has cardinality 1 .. 1 and conformance M

So it makes sence to also restrict the conformance of the Allergies And Intolerances template to 1 .. 1 M
Assignment 2017-11-03 11:18:21 : Assigned To Christof Gessner by Mathias Ghys
Tracking Open 2017-11-03 11:18:20 : Tracking by Mathias Ghys
Description
Finding:

In the Template EntryAllergyAndIntolerance   [1.3.6.1.4.1.19376.1.5.3.1.4.6]   in ART-DECOR, the hl7:id element is not consistent with the inheritance from the template Problem [1.3.6.1.4.1.19376.1.5.3.1.4.5]

- The template EntryAllergyAndIntolerance   inherit from the template Problem, the template EntryAllergyAndIntolerance   says that hl7:id is 0..* , however the template Problem says that hl7:id is 1..1. This is not permitted to relax constraints.

Suggestion:

- Change the EntryAllergyAndIntolerance template and make the id a 1 ... 1 (with a conformance M?)

Further explanation:

-

    
Labels
Preview Code HTML color Display Name Description
 
 TBA 
TBA TBA To be approved
To be discussed and approved
 
 M1 
M1 M1 Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2 M2 Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3 M3 Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4 M4 Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJ WJ Changes Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TID TID Template ID
Template-ID changes throughout the specification