Loading...
Help
Login
Busy
Search
eHDSI - Issues
 
Select object
 
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
240moodCode shall be INTClosedNormalChange Request2018-07-17 08:10:54Christof Gessner
 
 TBA 
 
Change RequestmoodCode shall be INT
Idepsos-issue-240
StatusClosed
PriorityNormal
Last Tracking2018-07-17 08:10:54  by  Mathias Ghys
Current AssigneeChristof Gessner
Current Labels
    
 (TBA) To be approved 
    
Concerns
Template
Entry Medication FulFillment Instructions (1.3.6.1.4.1.19376.1.5.3.1.4.3.1)
/
/
Template1.3.6.1.4.1.19376.1.5.3.1.4.3.1 (2013-12-20) Entry Medication FulFillment Instructions
StatusRetired
/
-
/
-
Events
TrackingClosed2018-07-17 08:10:54: Tracking by Mathias Ghys
    
 TBA 
Description
I guess this issue can be closed since the moodCode is adapted in ART-DECOR.
I agree with the proposal.
Assignment2017-11-24 13:36:16: Assigned To Christof Gessner by Christof Gessner
    
 TBA 
TrackingIn Progress2017-11-24 13:36:15: Tracking by Christof Gessner
    
 TBA 
Edited byChristof Gessner (2017-11-24 13:36:51)
Description
Finding:

-

There is an inconsistency between the specification with OID 1.3.6.1.4.1.19376.1.5.3.1.4.3.1 in the older EXPAND documentation (where the implementation guides were written in paper) where the old validator was based upon and the current ART-DÉCOR definitions.

Suggestion:

- Change to moodCode=INT

Further explanation:

- I checked the PDF documentation, the parent template from IHE PCC 1.3.6.1.4.1.19376.1.5.3.1.4.3.1, and the C-CDA template 2.16.840.1.113883.10.20.1.43

(see https://art-decor.ihe-europe.net/art-decor/decor-templates--IHE-PCC-?id=1.3.6.1.4.1.19376.1.5.3.1.4.3.1 )

Also see IHE PCC TF2  6.3.4.8.4:
 <act  classCode='ACT' moodCode='INT'>
The  related  statement   is  the  intent   (moodCode='INT')  on  how  the  related  entry  is  to  be 
performed.


    
Labels
PreviewCodeHTML colorDisplay NameDescription
 
 TBA 
TBATBATo be approved
To be discussed and approved
 
 M1 
M1M1Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2M2Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3M3Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4M4Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJWJChanges Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TIDTIDTemplate ID
Template-ID changes throughout the specification