Loading...
Help
Login
Busy
Search
eHDSI - Issues
 
Select object
 
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
293Schematron validation error for CDA Organization addressClosedNormalChange Request2019-04-30 14:22:09Mathias Ghys
 
 TBA 
 
Change RequestSchematron validation error for CDA Organization address
Idepsos-issue-293
StatusClosed
PriorityNormal
Last Tracking2019-04-30 14:22:09  by  Mathias Ghys
Current AssigneeMathias Ghys
Current Labels
    
 (TBA) To be approved 
    
Concerns
Template
epSOS CDA Organization (epsos-template-111)
/
/
Template2.16.840.1.113883.3.1937.777.11.10.111 (2013-12-20) epSOS CDA Organization
StatusRetired
/
-
/
-
Events
TrackingClosed2019-04-30 14:22:09: Tracking by Mathias Ghys
    
 TBA 
Description
Schematron rule adapted and corrected.
Assignment2019-02-13 09:43:08: Assigned To Mathias Ghys by Mathias Ghys
    
 TBA 
TrackingOpen2019-02-13 09:43:07: Tracking by Mathias Ghys
    
 TBA 
Description
Finding:

We encounter the following schematron validation error when trying to validate the organization country.

#4:

location: /:ClinicalDocument[namespace-uri()='urn:hl7-org:v3'] [1]/:legalAuthenticator[namespace-uri()='urn:hl7-org:v3'] [1]/:assignedEntity[namespace-uri()='urn:hl7-org:v3'] [1]/:representedOrganization[namespace-uri()='urn:hl7-org:v3'] [1]

test: count(hl7:addr[hl7:country[concat(@code, @codeSystem) = doc('include/voc-1.3.6.1.4.1.12559.11.10.1.3.1.42.4-DYNAMIC.xml')//valueSet[1]/conceptList/concept/concat(@code, @codeSystem) or @nullFlavor]]) >= 1

message: (epSOSCDAOrganization): element hl7:addr[hl7:country[concat(@code, @codeSystem) = doc('include/voc-1.3.6.1.4.1.12559.11.10.1.3.1.42.4-DYNAMIC.xml')//valueSet [1] /conceptList/concept/concat(@code, @codeSystem) or @nullFlavor]] is required  [min 1x] .

The reason is that the schematron rule expects the country code to be in the @code attribute

Suggestion:

- Adapt the schematron rule for the country element

Further explanation:

-

    
Labels
PreviewCodeHTML colorDisplay NameDescription
 
 TBA 
TBATBATo be approved
To be discussed and approved
 
 M1 
M1M1Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2M2Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3M3Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4M4Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJWJChanges Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TIDTIDTemplate ID
Template-ID changes throughout the specification