Help
Login
Busy
Search
eHDSI - Issues

 
Select object
 
false
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
295 Improve description of number of packages element for the substanceAdministration template Closed Normal Change Request 2019-12-23 14:13:26 Mathias Ghys
 
Change Request Improve description of number of packages element for the substanceAdministration template
Id epsos-issue-295
Status Closed
Priority Normal
Last Tracking 2019-12-23 14:13:26  by  Mathias Ghys
Current Assignee Mathias Ghys
    
Concerns
Template
false
epSOS CDA substanceAdministration (1.3.6.1.4.1.12559.11.10.1.3.1.3.2)
/
/
Template 1.3.6.1.4.1.12559.11.10.1.3.1.3.2 (2013-12-20) epSOS CDA substanceAdministration
Status Retired
/
-
/
-
Events
Tracking Closed 2019-12-23 14:13:26 : Tracking by Mathias Ghys
Description
This issue can be closed since it is implemented based on the non-CP that has been received by support ( IM0018146281 )
Assignment 2019-02-15 13:51:34 : Assigned To Mathias Ghys by Mathias Ghys
Tracking Open 2019-02-15 13:51:33 : Tracking by Mathias Ghys
Edited by mghys ( 2020-09-15 11:59:51 )
Description
Finding:

- A lot of confusion about this element in the preparation of the February test event.

An issue has been created in JIRA: https://ec.europa.eu/cefdigital/tracker/browse/EHSEMANTIC-381

Suggestion:

- Current description:

The supply entry should indicate the quantity supplied (such as tablets or containers). The value attribute shall be present and indicates the quantity of medication supplied. If the medication is supplied in dosing units (tablets or capsules), then the unit attribute need not be present (and should be set to 1 if present). Otherwise, the unit element shall be present to indicate the quantity (e.g., volume or mass) of medication supplied.

feedback from Christof GESSNER  absent information means "1"

Further explanation:

-

    
Labels
Preview Code HTML color Display Name Description
 
 TBA 
TBA TBA To be approved
To be discussed and approved
 
 M1 
M1 M1 Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2 M2 Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3 M3 Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4 M4 Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJ WJ Changes Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TID TID Template ID
Template-ID changes throughout the specification