Loading...
Help
Login
Busy
Search
eHDSI - Issues
 
Select object
 
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
308Modify description for strength and package size reflect CP-25ClosedNormalChange Request2019-07-16 14:24:34Mathias Ghys
 
Change RequestModify description for strength and package size reflect CP-25
Idepsos-issue-308
StatusClosed
PriorityNormal
Last Tracking2019-07-16 14:24:34  by  Mathias Ghys
Current AssigneeMathias Ghys
    
Concerns
Template
epSOS CDA Material (epsos-template-143)
/
/
Template2.16.840.1.113883.3.1937.777.11.10.143 (2018-09-20 14:46:04) epSOS CDA Material
StatusRetired
/
-
/
-
Events
TrackingClosed2019-07-16 14:24:34: Tracking by Mathias Ghys
Assignment2019-05-14 15:31:18: Assigned To Mathias Ghys by Mathias Ghys
TrackingOpen2019-05-14 15:31:17: Tracking by Mathias Ghys
Description
Finding:

- Add descriptions to strength and package size to reflect CP -25
Link to JIRA issue: https://ec.europa.eu/cefdigital/tracker/browse/EHSEMANTIC-414

Suggestion:

-

Further explanation:

-

    
Labels
PreviewCodeHTML colorDisplay NameDescription
 
 TBA 
TBATBATo be approved
To be discussed and approved
 
 M1 
M1M1Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2M2Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3M3Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4M4Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJWJChanges Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TIDTIDTemplate ID
Template-ID changes throughout the specification