Help
Login
Busy
Search
eHDSI - Issues

 
Select object
 
false
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
396 Load Value sets modified in MVC v6.2.0 in ART-DECOR Closed Normal Change Request 2023-01-18 14:48:41 Mathias Ghys
 
Change Request Load Value sets modified in MVC v6.2.0 in ART-DECOR
Id epsos-issue-396
Status Closed
Priority Normal
Last Tracking 2023-01-18 14:48:41  by  Mathias Ghys
Current Assignee Mathias Ghys
    
Concerns
Value Set
false
ActStatus (v3.ActStatus)
/
Name ActStatus Display Name ActStatus
Version 2014-03-26 (repository: ad2bbr-) Status Final
Version Label DEFN=UV=VO=1360-20160323 Id v3.ActStatus
Description

History description 2014-03-26: Lock all vaue sets untouched since 2014-03-26 to trackingId 2014T1_2014_03_26

description:

Contains the names (codes) for each of the states in the state-machine of the RIM Act class.

Source Codesystems
2.16.840.1.113883.5.14 ActStatus http://terminology.hl7.org/CodeSystem/v3-ActStatus
Values
Level/Type Code Display Name Codesystem Description
0-S
normal
normal
2.16.840.1.113883.5.14
1-L
aborted
aborted
2.16.840.1.113883.5.14
1-L
active
active
2.16.840.1.113883.5.14
1-L
cancelled
cancelled
2.16.840.1.113883.5.14
1-L
completed
completed
2.16.840.1.113883.5.14
1-L
held
held
2.16.840.1.113883.5.14
1-L
new
new
2.16.840.1.113883.5.14
1-L
suspended
suspended
2.16.840.1.113883.5.14
0-L
nullified
nullified
2.16.840.1.113883.5.14
0-L
obsolete
obsolete
2.16.840.1.113883.5.14
Legenda: Type L=leaf, S=specializable, A=abstract, D=deprecated. NullFlavors to appear in @nullFlavor attribute instead of @code.
/
-
/
-
Events
Tracking Closed 2023-01-18 14:48:41 : Tracking by Mathias Ghys
Description
Value Sets loaded in ART-DECOR and older versions set to deprecated.
Assignment 2023-01-18 14:40:58 : Assigned To Mathias Ghys by Mathias Ghys
Tracking Open 2023-01-18 14:40:57 : Tracking by Mathias Ghys
Description
Finding:

- Based on MVC v6.2.0 release, the value sets that changed have to be loaded in ART-DECOR

Suggestion:

-

Further explanation:

-

    
Labels
Preview Code HTML color Display Name Description
 
 TBA 
TBA TBA To be approved
To be discussed and approved
 
 M1 
M1 M1 Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2 M2 Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3 M3 Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4 M4 Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJ WJ Changes Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TID TID Template ID
Template-ID changes throughout the specification