Loading...
Help
Login
Busy
Search
eHDSI - Issues
 
Select object
 
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
424Fix wrong templateId in NI exampleClosedNormalChange Request2024-01-26 16:14:02Mathias Ghys
 
Change RequestFix wrong templateId in NI example
Idepsos-issue-424
StatusClosed
PriorityNormal
Last Tracking2024-01-26 16:14:02  by  Mathias Ghys
Current AssigneeMathias Ghys
    
Concerns
Template
eHDSI Medication Item (1.3.6.1.4.1.12559.11.10.1.3.1.3.4)
/
/
Template1.3.6.1.4.1.12559.11.10.1.3.1.3.4 (2024-01-25 13:59:32) eHDSI Medication Item
StatusActive
/
-
/
-
Events
TrackingClosed2024-01-26 16:14:02: Tracking by Mathias Ghys
Assignment2024-01-26 16:02:28: Assigned To Mathias Ghys by Mathias Ghys
TrackingOpen2024-01-26 16:02:27: Tracking by Mathias Ghys
Edited bymghys (2024-01-26 16:13:53)
Description
Finding:

- Issue raised by ES:

We contact you because we have identified an error in an example of NI in art-décor. The error we have identified can be found in the Wave 6 specification, concretely in the eHSDI Medication Item: https://art-decor.ehdsi.eu/publication/epSOS/epsos-html-20230118T153212/tmp-1.3.6.1.4.1.12559.11.10.1.3.1.3.4-2022-12-08T161908.html

As you can see in the following pictures, the template id assigned in the consumable/manufacturedProduct is: 1.3.6.1.4.1.12559.11.10.1.3.1.3.1 when based on the definition we have in art-décor should be: 1.3.6.1.4.1.12559.11.10.1.3.1.3.31 as you can check in eHDSI PS Medication Information: https://art-decor.ehdsi.eu/publication/epSOS/epsos-html-20230118T153212/tmp-1.3.6.1.4.1.12559.11.10.1.3.1.3.31-2022-01-11T164400.html

Added to that when you validate a CDA L3 (PIVOT version), with both templateIds informed in the CDA, the validation retrieve a model based and schematron OK validation…and based on this definition we understand that is not correct.

Link to JIRA issue: https://citnet.tech.ec.europa.eu/CITnet/jira/browse/EHEALTH-10503

Suggestion:

- Fix the example

Further explanation:

-

    
Labels
PreviewCodeHTML colorDisplay NameDescription
 
 TBA 
TBATBATo be approved
To be discussed and approved
 
 M1 
M1M1Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2M2Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3M3Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4M4Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJWJChanges Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TIDTIDTemplate ID
Template-ID changes throughout the specification