Help
Login
Busy
Search
eHDSI - Issues

 
Select object
 
false
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
427 CP-081 - Bind the eHDSIBodySite vocabulary with the body site element Closed Normal Change Request 2024-04-18 13:10:13 Mathias Ghys
 
Change Request CP-081 - Bind the eHDSIBodySite vocabulary with the body site element
Id epsos-issue-427
Status Closed
Priority Normal
Last Tracking 2024-04-18 13:10:13  by  Mathias Ghys
Current Assignee Mathias Ghys
    
Concerns
Template
false
eHDSI Procedure (1.3.6.1.4.1.12559.11.10.1.3.1.3.26)
/
/
Template 1.3.6.1.4.1.12559.11.10.1.3.1.3.26 (2024-04-17 14:46:30) eHDSI Procedure
Status Active
/
-
/
-
Events
Tracking Closed 2024-04-18 13:10:13 : Tracking by Mathias Ghys
Description
Implemented.
Assignment 2024-04-17 14:49:14 : Assigned To Mathias Ghys by Mathias Ghys
Tracking Open 2024-04-17 14:49:13 : Tracking by Mathias Ghys
Description
Finding:

- A new value set is introduced in MVC v8.0.0 with concepts to indicate the body site. This element now needs to be bound with this value set.

Suggestion:

- add the vocabulary binding to the eHDSIBodySite value set

Further explanation:

-

    
Labels
Preview Code HTML color Display Name Description
 
 TBA 
TBA TBA To be approved
To be discussed and approved
 
 M1 
M1 M1 Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2 M2 Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3 M3 Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4 M4 Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJ WJ Changes Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TID TID Template ID
Template-ID changes throughout the specification