Loading...
Help
Login
Busy
Search
eHDSI - Issues
 
Select object
 
Results (1 / 1)
Id Issue Status Priority Type Date Assigned To Label
58Assign an epSOS specific template IDClosedNormalChange Request2018-11-19 12:54:31
 
 TID 
 
Change RequestAssign an epSOS specific template ID
Idepsos-issue-58
StatusClosed
PriorityNormal
Last Tracking2018-11-19 12:54:31  by  Mathias Ghys
Current Labels
    
 (TID) Template ID 
    
Concerns
Template
Section Functional Status (1.3.6.1.4.1.19376.1.5.3.1.3.17)
/
/
Template1.3.6.1.4.1.19376.1.5.3.1.3.17 (2013-12-20) Section Functional Status
StatusRetired
Template
Social History Observation (1.3.6.1.4.1.19376.1.5.3.1.4.13.4)
/
/
Template1.3.6.1.4.1.19376.1.5.3.1.4.13.4 (2013-12-20) Social History Observation
StatusRetired
/
-
/
-
Events
TrackingClosed2018-11-19 12:54:31: Tracking by Mathias Ghys
    
 TID 
Description
Closed this issue, since I combined all the OID related issues in issue #242: https://art-decor.ehdsi.eu/art-decor/decor-issues-epsos?id=2.16.840.1.113883.3.1937.777.11.6.242

This is a known issue and has been analyzed on the confluence page: https://ec.europa.eu/cefdigital/wiki/x/haJUAw

TrackingOpen2016-07-13 14:51:30: Tracking by Giorgio Cangioli
    
 TID 
TrackingOpen2016-04-04 16:10:16: Tracking by Dr. Kai U. Heitmann
    
 M2 
    
 TID 
TrackingOpen2015-11-18 13:58:02: Tracking by Giorgio Cangioli
    
 M2 
TrackingOpen2015-11-09 15:13:53: Tracking by Giorgio Cangioli
Description
Finding:

This is a specializaiton od the 1.3.6.1.4.1.19376.1.5.3.1.4.13.4 IHE PCC template

Suggestion:

Assign an epSOS specific template that defines the epSOS additional constrains .

For backward on-the-wire compatibility do not make this template as required.

Further explanation:

this is a general issue to be analyzed for many templates used in epSOS

    
Labels
PreviewCodeHTML colorDisplay NameDescription
 
 TBA 
TBATBATo be approved
To be discussed and approved
 
 M1 
M1M1Milestone 1
Milestone 1 – before the EXPAND-athon 9-12 December 2015 Lisbon
 
 M2 
M2M2Milestone 2
Milestone 2 – final results to be delived at the end of EXPAND
 
 M3 
M3M3Milestone 3
Milestone 3 – end of the HL7 International Project
 
 M4 
M4M4Milestone 4
Milestone 4 – for consideration in the future / desiderata
 
 WJ 
WJWJChanges Word/JIRA
Changes in the Word Specification/Open a JIRA issue
 
 TID 
TIDTIDTemplate ID
Template-ID changes throughout the specification